VC Engineering Sdn Bhd recently completed the design and build of a Class 100K Cleanroom in Selangor, Malaysia.
The project brought together cleanroom architecture, mechanical, electrical, and ELV systems under one coordinated scope, with a focus on delivering a controlled and functional environment that meets the client’s operational requirements.
Key Project Works
- Cleanroom wall and ceiling panels
- Speed and personnel doors
- MCC and DB panels
- Electrical installations
- AHU and ducting systems
- Door interlocking systems
- Cleanroom lighting and emergency systems
The project required close coordination between multiple engineering disciplines to ensure that each system was properly integrated within the cleanroom environment. From design coordination through installation, careful planning helped ensure the different components worked together effectively.
For VC Engineering, successful project delivery goes beyond completing the installation. It is about bringing different engineering disciplines together to deliver a practical, reliable solution tailored to the client’s needs.
This project reflects our commitment to delivering integrated cleanroom solutions from design to completion, supporting clients with coordinated engineering and installation services.










